RELIABILITY CENTERED MAINTENANCE (RCM)” Increasing Safety & Reliability in Gas Pipeline System
RELIABILITY CENTERED MAINTENANCE (RCM) – Increasing Safety & Reliability in Gas Pipeline System
Bandung | 01 – 03 Februari 2017 | Rp 6.500.000/person
Bandung | 27 Februari – 01 Maret 2017 | Rp 6.500.000/person
Bandung | 05 – 07 April 2017 | Rp 6.500.000/person
Bandung | 22 – 24 Mei 2017 | Rp 6.500.000/person
Jadwal Training 2017 Selanjutnya …
INTRODUCTION :
This course teaches the fundamentals of Reliability-Centered Maintenance (RCM). The course gives the participant fundamental tools and knowledge required to participate in any RCM analysis process especially in gas pipeline industry. Participant will have a good practice to developing and implemeted RCM .
WHO SHOULD ATTEND THIS TRAINING?
Maintenance managers, maintenance supervisors, reliability and maintenance engineers, maintenance technicians, production managers, production supervisors, operators, plant engineers, and anyone who is involved in operating and maintaining of assets.
TRAINING OBJECTIVE :
After the course participant will have a good understanding of :
- Fundamental Reliability Centered Maintenance (RCM) philosophies
- How to evaluate failure consequences
- How to select preventive maintenance tasks and intervals
- How to select predictive maintenance tasks and intervals
- How to select failure finding tasks and intervals
- What other function protective actions are available
- When run-to-failure is appropriate
- How to packaging and implement RCM analysis results
- Commercial RCM standards
- Various approaches to RCM
- RCM terminology
- Identifying and allocating resources for a RCM program
- Techniques for prioritizing systems for analysis
- Use of Weibull and statistical analysis in RCM processes
- Packaging and implementing RCM analysis results
MATERIAL OUTLINE RELIABILITY CENTERED MAINTENANCE (RCM):
A. Theory
- Introduction to Reliability Centered Maintenance (RCM) concepts
- RCM analysis preparation
- Techniques for prioritizing systems for analysis
- Failure Modes and Effect Consequence Analysis for RCM
- Evaluating failure consequences
- Statistics in RCM
- Statistical principles used in RCM
- Use of Weibull analysis in RCM processes
- Selecting the right maintenance tasks for reliability
- How to select preventive maintenance (PM) tasks and intervals
- How to select predictive maintenance (PdM) tasks and intervals
- How to select failure finding tasks and intervals
- Other functional maintenance strategies
- When Run-to-Failure is appropriate
- implementing RCM results
B. Workshops (practice)
- Applied RCM in station gas compressor
- Gas turbine-compressor system
- Gas treatment plant ( gas dehydration system, H2S removal)
- (participants should prepare their laptop, P&ID, Process flow )
C. Interactive Discussion
INSTRUCTOR
Ir. Deddy Nugraha is a dedicated experienced fulltime trainer and technical consultant since 2002. He holds a B.S. degree in Mechanical Engineering from ITB, Bandung. He has worked nationally in a wide variety of industries including: technology, aerospace, utilities, auditing, mining and institutions thus engaged as a corporate consultant. He also holds certifications for those particular fields from Snecma, France; Engine Support Inc., USA; Danobat, Spain; DNV, Singapore; MTU, Germany and FAA Auditor, USA. Mr. Nugraha is a member of Indonesian Society for Reliability and was elected as General Sectretay for 2004-2007 period. He has trained hundreds of managers, engineers and floor associates, subjects taught to include; CMMS, RCM, TPM, Project Management, Quality Process Control, Corrosion Control and Protection, Failure Analysis, Engineering Design, Instalation & Constrcution, Inventory Control and Management. Major clients include: Pertamina, British Petroleum, Petrochina, Siemen Power, PT. Indonesia Power, PT. Krakatau Steel, Freeport Indonesia, PT. Surveyor Indonesia, Chevron, Medco Energy, PT. Aneka Tambang, Garuda Maintenance Facility, PT. Perusahaan Gas Negara, PT. Semen Padang, PT. Semen Gresik, PT. Indah Kiat Pulp & Paper, PT. Tjiwi Kimia, PT. Pupuk Kujang and PT. Kaltim Prima Coal.
VENUE
Kagum Group Hotel Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll
TRAINING DURATION
3 days
- 01 Feb 2017-03 Feb 2017
- 27 Feb 2017-01 Mar 2017
- 05 Apr 2017-07 Apr 2017
- 22 May 2017-24 May 2017
- 19 Jun 2017-21 Jun 2017
- 05 Jul 2017-07 Jul 2017
- 14 Aug 2017-16 Aug 2017
- 06 Sep 2017-08 Sep 2017
- 04 Oct 2017-06 Oct 2017
- 30 Oct 2017-01 Nov 2017
- 27 Dec 2017-29 Dec 2017
INVESTATION PRICE/ PERSON
- Rp 6.500.000/person (full fare) or
- Rp 6.250.000/person (early bird, payment 1 week before training) or
- Rp 5.950.000/person (if there are 3 persons or more from the same company)
FACILITIES FOR PARTICIPANTS
- Training Module
- Flash Disk contains training material
- Certificate
- Stationeries: NoteBook and Ballpoint
- T-Shirt
- Bag
- Training Photo
- Training room with Full AC facilities and multimedia
- Lunch and twice coffeebreak every day of reliability centered maintenance training
- Qualified Instructor
- Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)
RECOMMENDATION FOR PARTICIPANTS
For practice session: every participant is recommended to bring laptop/notebook for software installation and practice