By July 12, 2012 0 Comments Read More →

Power Plant Operation

Power Plant Operation

Hotel Aston Tropicana / Hotel Papandayan Bandung |  10 – 13 Juli 2012 | Rp 8.500.000/peserta 
Hotel Aston Tropicana / Hotel Papandayan Bandung | 24 – 27 Juli 2012 | Rp 8.500.000/peserta
Hotel Aston Tropicana / Hotel Papandayan Bandung | 07 – 10 Agustus 2012 | Rp 8.500.000/peserta 
Hotel Aston Tropicana / Hotel Papandayan Bandung | 28 – 31 Agustus 2012 | Rp 8.500.000/peserta 
Hotel Aston Tropicana / Hotel Papandayan Bandung | 04 – 07 September 2012 | Rp 8.500.000/peserta 
Hotel Aston Tropicana / Hotel Papandayan Bandung | 18 – 21 September 2012 | Rp 8.500.000/peserta
Hotel Aston Tropicana / Hotel Papandayan Bandung | 02 – 05 Oktober 2012 | Rp 8.500.000/peserta
Hotel Aston Tropicana / Hotel Papandayan Bandung | 16 – 19 Oktober 2012 | Rp 8.500.000/peserta
Hotel Aston Tropicana / Hotel Papandayan Bandung | 06 – 09 November 2012  | Rp 8.500.000/peserta
Hotel Aston Tropicana / Hotel Papandayan Bandung | 27 – 30 November 2012 | Rp 8.500.000/peserta 
Hotel Aston Tropicana / Hotel Papandayan Bandung | 04 – 07 Desember 2012 | Rp 8.500.000/peserta 
Hotel Aston Tropicana / Hotel Papandayan Bandung | 18 – 21 Desember 2012 | Rp 8.500.000/peserta

 

 

 


ABSTRACT

This course offers a firm understanding of the basic operations of Combine Cycle Plants. The course is designed for those persons with no or limited knowledge of Combine Cycle Plants.

The objective of this course is to give participants an understanding of basic Combine Cycle Power Plants operations as well as a fundamental knowledge on plant start-up, normal operations, shutdown and abnormal operations. A distinct emphasis upon safe, efficient power plant operations.

Emphasis is placed on the following areas:

  • Thermodynamic Review
  • Operating Philosophy
  • General Operator Responsibilities
  • Systems Review and Operation
  • Plant Start-up
  • Operations
  • Shutdown

COURSE CONTENT

  • Introduction
  •  Thermodynamic Review
  •  Operating Philosophy
  • General Operator Responsibilities
  • Balance of Plant Systems Review and Operation
  •   Gas Turbine Review and Operation
  • HRSG Review and Operation
  • Steam Turbine Review and Operation

Combine Cycle Startup

  • Pre Startup Requirements
  • Gas Turbine Startup
  •  HRSG Startup
  • Auto Drain Sequence
  • Steam Turbine Startup

Combine Cycle Normal Operation

  • Off Peaking Operations
  • GT Water Wash
  •  Routing Testing & Maintenance

Combine Cycle Shutdown

Combine Cycle Startup – Review

  • Load Rejection
  • Trips
  • Loss of Lube Oil
  •  Loss of Vacuum

Review

INSTRUCTOR

Dr. Ir. Harwin Saptoadi, M.Sc.


WHO WILL BENEFIT/PARTICIPANT

Operators, engineers, technicians, and administrative personnel of operating facilities as well those who may work in affiliated industries, who wish to gain an understanding of the day-to-day operation of Combine Cycle Power Plant.



COURSE METHODS

Multimedia, Group Discussion, Role Play, Case Study

Investasi:

  • Biaya pelatihan sebesar Rp 8.500.000/peserta Non residensial.

Fasilitas:

  • Meeting room hotel *****
  • Training kit
  • Breakfeast and luch
  • Exclusive souvenir
  • Sertitifikat
  • Special  dinner in the last day
  • Wisata Budaya dan Belanja

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

Posted in: Bandung, Electrical

About the Author:

Post a Comment