Piping & Pipeline

PIPELINE INTEGRITY MANAGEMENT SYSTEM OF CORROSION CONTROL & CATHODIC PROTECTION
By October 17, 2011 0 Comments Read More →

PIPELINE INTEGRITY MANAGEMENT SYSTEM OF CORROSION CONTROL & CATHODIC PROTECTION

PIPELINE INTEGRITY MANAGEMENT SYSTEM OF CORROSION CONTROL &CATHODIC PROTECTION Wisma MM UGM, Yogyakarta | 2-4 nov 2011 | IDR 7.500.000 / participant  Wisma MM UGM, Yogyakarta | 9-11 nov 2011 | IDR 7.500..000 / participant  Wisma MM UGM, Yogyakarta | 16-18 nov 2011 | IDR 7.500.000 / participant  Wisma MM UGM, Yogyakarta | 23-25 nov 2011 | IDR 7.500.000 / participant  Wisma MM UGM, Yogyakarta | 30 nov – 2 des 2011 | IDR 7.500.000 / […]

PIPELINE SYSTEM : MECHANICAL DESIGN & SPECIFICATION
By October 17, 2011 0 Comments Read More →

PIPELINE SYSTEM : MECHANICAL DESIGN & SPECIFICATION

PIPELINE SYSTEM : MECHANICAL DESIGN & SPECIFICATION Wisma MM UGM, Yogyakarta | 28 November – 1 Desember 2011 | IDR 7.500.000,-/ participant  Wisma MM UGM, Yogyakarta | 23 – 26 Januari 2012 | IDR 7.500.000,-/ participant OBJECTIVE After completion of training, participants will be able to: Having knowledges more expanded in Piping and pipeline. Understanding parameters which determining of […]

Centrifugal pump : operation & maintenance – (PASTI JALAN)
By October 9, 2011 0 Comments Read More →

Centrifugal pump : operation & maintenance – (PASTI JALAN)

Centrifugal pump : operation & maintenance The Phoenix Hotel, Jakarta | November 1st – 4th 2011 | IDR 9.500.000,- / participant (non residential)   Description Assuming that a plant is a body of human being, pumps are the “heart” of the body. Those play very important and vital roles to flow the “blood” of a […]

Pipeline Design & Constructions
By September 22, 2011 0 Comments Read More →

Pipeline Design & Constructions

Pipeline Design & Constructions Hotel All Seasons, Yogyakarta |  21 s.d 23 Februari 2012 | Rp. 6.500.000,-/participant (non residential) Hotel All Seasons, Yogyakarta | 24 s.d 26 April 2012 | Rp. 6.500.000,-/participant (non residential) DESKRIPSI Dalam perusahaan oil & gas, penggunaan pipa merupakan suatu keharusan. Oleh karena itu melakukan design dan kontruksi pemasangan pipa harus dilakukan dengan perencanaan yang […]

MECHANICAL SEAL
By August 10, 2011 0 Comments Read More →

MECHANICAL SEAL

MECHANICAL SEAL Hotel UNY Jl Colombo Yogyakarta | 13-15 Sept 2011  | 08.00 – 16.00 WIB | Rp. 4.500.000 per peserta Description Mechanical Seal adalah komponen yang digunakan menyekat antara dua fluida kerja (zat cair dan gas) sehingga tidak terjadi kebocoran fluida kerja yang melewati sebuah poros. Kemampuan penyekatan (sealing performance) serta umur seal sangat bergantung […]

PIPING SYSTEM AND VALVES
By July 31, 2011 0 Comments Read More →

PIPING SYSTEM AND VALVES

PIPING SYSTEM AND VALVES – Yogyakarta Hotel Puri Artha – Yogyakarta  | 11 – 13 Oktober 2011 | Rp 5.500.000,- Hotel Puri Artha – Yogyakarta| 14 – 16 Desember   2011 | Rp 5.500.000,- DESKRIPSI Within industry, piping is a system of pipes used to convey fluids (liquids and gases) from one location to another. The engineering […]

NATURAL GAS PIPELINE TECHNOLOGIES AND ECONOMICS
By July 20, 2011 0 Comments Read More →

NATURAL GAS PIPELINE TECHNOLOGIES AND ECONOMICS

NATURAL GAS PIPELINE TECHNOLOGIES AND ECONOMICS Hotel Golden Flower**** (Bandung) | 15-17 November 2011 | Rp. 8.500.000,- /orang Hotel Ibis**** (Yogyakarta) | 6-8 Desember 2011 | Rp. 8.500.000,- /orang DESKRIPSI Penyaluran gas bumi dari produsen ke konsumen, ataupun dari suatu tempat ke tempat lain dalam suatu areal industri sebagian besar dilakukan melalui pipa yang kelayakannya sangat tergantung […]

AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEMS – (Pasti Jalan)
By June 20, 2011 0 Comments Read More →

AC AND REFRIGERATION : SAFETY AND CONTROL SYSTEMS – (Pasti Jalan)

AC AND REFRIGERATION :  SAFETY AND  CONTROL  SYSTEMS Hotel Harris, Tebet Jakarta | 25 – 28 Juli 2011 | Rp 7.500.000,-/ peserta   Deskripsi Memberikan pengetahuan tentang dasar peralatan kontrol dan keamanan pada mesin-mesin pendingin atau mesin refrigerasi. Berbagai macam peralatan dan sistem keamanan dijelaskan secara komprehensif mulai dari pemilihan, prinsip kerja, perawatan, dan penanganan […]

Pipeline System : Mechanical Design & Specification (PASTI JALAN)
By June 20, 2011 0 Comments Read More →

Pipeline System : Mechanical Design & Specification (PASTI JALAN)

Pipeline System: Mechanical Design & Specification Wisma MM UGM, Jl. Colombo No.1 Yogyakarta | July 25th – 29th 2011 | IDR 6.500.000 / participant   1. Objectives   After completion of training, participants will be able to: Having knowledge more expanded in Piping and Pipeline Understanding parametes which determining of design Be able to do material […]

Posted in: Piping & Pipeline
PIPING SYSTEM AND VALVES
By June 12, 2011 0 Comments Read More →

PIPING SYSTEM AND VALVES

PIPING SYSTEM AND VALVES Yogyakarta | 21 s.d 23 Juni 2011 | Rp. 4.500.000,-/peserta nett non residential   Description Within industry, piping is a system of pipes used to convey fluids (liquids and gases) from one location to another. The engineering discipline of piping design studies the efficient transport of fluid. Industrial process piping (and […]