CENTRIFUGAL COMPRESSORS AND STEAM TURBINES

CENTRIFUGAL COMPRESSORS AND STEAM TURBINES

The Jayakarta  Hotel, bandung | 2-5 May 2012 | Rp. 6.990.000,-/ perpeserta
The Jayakarta  Hotel, bandung | 1-4  Auguts 2012   | Rp. 6.990.000,-/ perpeserta
The Jayakarta  Hotel, bandung | 31 Oktober -3  November 2012 | Rp. 6.990.000,-/ perpeserta




OBJECTIVES

The course entails a study of gas compression and expansion laws applied to industrial processes followed by an illustration of the different types of rotating machines usually used in plants, and their related aspects. The aim is to provide a satisfactory approach to the problems posed by compressors and turbines and the means to solve them.

COURSE CONTENTS

1.    centrifugal compressor

  •  Basic Theory of Centrifugal Compressor and Installation
    •  The need for energy and pressure installations
    • The principle of energy transfer
    • Characteristics and compressor installations
    •  Specification compressor
    •  Selection of compressor
    •  Changes in the physical properties of the gas in the process of installation
  •  Symptoms of Critical Operation
    •  Excessive Pressure
    •  Negative Pressure
    •  Excessive Temperatures
    • pressure fluctuations
  • operation
    • Procedure to start and stop the compressor
    •  setting capacity
    • Prevention of danger
    • Checking the operating condition
  •  Troubleshooting

2.Steam Turbine

  •  Steam Turbine Theory and Basic Installation
    •  The principle of energy transfer
    •  Characteristics and compressor installations
    • Specification compressor
    • The main components of steam turbines
    • Operation
    • Procedure to start and stop the compressor
    •  round & load control system
    • troubleshooting

WHO SHOULD ATTEND

Graduate engineers and managerial staff involved in centrifugal compressor and steam turbines operation, maintenance and/or engineering.

INSTRUCTOR

Syahbardia, Ir. MT. And Team

He is  alumnus of mechanical engineering the institude technology Bandung, ITB (undergraduate), and materials engineering ITB for the master program. He had been a lecturer at the Polytechnic of ITB / POLBAN and now he became a lecturer in engineering at the university Pasundan, Bandung. He has practical field experience as a mechanical engineer when he worked, as in IPTN, PINDAD, and PAL.

Ir. Syahbardia, MT. has often become an instructor in industrial trainings for companies in Indonesia. Among the titles that he conveyed was that the Predictive and Preventive Maintenance Pump, Compressor Characteristic Maintenance & Troubleshooting, Rotary Equipment Maintenance, Lubrication, Operation, Maintenance and Trouble Shooting, Materials Selection and Knowledge for Engineers, Centrifugal Compressor & Steam Turbine Performance, Welding Inspection, Turbine & Generator Operation, Boiler Water Treatment, Pump Operation and Maintenance, Electrical Motor Control Systems, Corrosion and Cathodic Protection, Fluid Flow Measurement, Generator Preventive Maintenance, Heavy Equipment Management, Preventive and Predictive Maintenance, and others

TEMPAT DAN WAKTU

Waktu           : 08.30-16.30 WIB
Tempat         :  The Jayakarta  Hotel bandung
Tanggal        :

  • 2-5 May 2012 (Bacth II)
  • 1-4  Auguts 2012 (Bacth III)
  • 31-3  November 2012 (Batch IV)

INVESTASI

  • IDR 6.999.000,-/participant non residensial. For send 3 participant discount 10 %.

 FASILITAS

  • Meeting Room Hotel ****
  • Training KIT
  • Souvenir
  • Sertifikat
  • 2 X Coffe Break + Lunch

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

About the Author:

Post a Comment