CENTRIFUGAL COMPRESSORS AND STEAM TURBINES
CENTRIFUGAL COMPRESSORS AND STEAM TURBINES
The Jayakarta Hotel, bandung | 2-5 May 2012 | Rp. 6.990.000,-/ perpeserta
The Jayakarta Hotel, bandung | 1-4 Auguts 2012 | Rp. 6.990.000,-/ perpeserta
The Jayakarta Hotel, bandung | 31 Oktober -3 November 2012 | Rp. 6.990.000,-/ perpeserta
OBJECTIVES
The course entails a study of gas compression and expansion laws applied to industrial processes followed by an illustration of the different types of rotating machines usually used in plants, and their related aspects. The aim is to provide a satisfactory approach to the problems posed by compressors and turbines and the means to solve them.
COURSE CONTENTS
1. centrifugal compressor
- Basic Theory of Centrifugal Compressor and Installation
- The need for energy and pressure installations
- The principle of energy transfer
- Characteristics and compressor installations
- Specification compressor
- Selection of compressor
- Changes in the physical properties of the gas in the process of installation
- Symptoms of Critical Operation
- Excessive Pressure
- Negative Pressure
- Excessive Temperatures
- pressure fluctuations
- operation
- Procedure to start and stop the compressor
- setting capacity
- Prevention of danger
- Checking the operating condition
- Troubleshooting
2.Steam Turbine
- Steam Turbine Theory and Basic Installation
- The principle of energy transfer
- Characteristics and compressor installations
- Specification compressor
- The main components of steam turbines
- Operation
- Procedure to start and stop the compressor
- round & load control system
- troubleshooting
WHO SHOULD ATTEND
Graduate engineers and managerial staff involved in centrifugal compressor and steam turbines operation, maintenance and/or engineering.
INSTRUCTOR
Syahbardia, Ir. MT. And Team
He is alumnus of mechanical engineering the institude technology Bandung, ITB (undergraduate), and materials engineering ITB for the master program. He had been a lecturer at the Polytechnic of ITB / POLBAN and now he became a lecturer in engineering at the university Pasundan, Bandung. He has practical field experience as a mechanical engineer when he worked, as in IPTN, PINDAD, and PAL.
Ir. Syahbardia, MT. has often become an instructor in industrial trainings for companies in Indonesia. Among the titles that he conveyed was that the Predictive and Preventive Maintenance Pump, Compressor Characteristic Maintenance & Troubleshooting, Rotary Equipment Maintenance, Lubrication, Operation, Maintenance and Trouble Shooting, Materials Selection and Knowledge for Engineers, Centrifugal Compressor & Steam Turbine Performance, Welding Inspection, Turbine & Generator Operation, Boiler Water Treatment, Pump Operation and Maintenance, Electrical Motor Control Systems, Corrosion and Cathodic Protection, Fluid Flow Measurement, Generator Preventive Maintenance, Heavy Equipment Management, Preventive and Predictive Maintenance, and others
TEMPAT DAN WAKTU
Waktu : 08.30-16.30 WIB
Tempat : The Jayakarta Hotel bandung
Tanggal :
- 2-5 May 2012 (Bacth II)
- 1-4 Auguts 2012 (Bacth III)
- 31-3 November 2012 (Batch IV)
INVESTASI
-
IDR 6.999.000,-/participant non residensial. For send 3 participant discount 10 %.
FASILITAS
- Meeting Room Hotel ****
- Training KIT
- Souvenir
- Sertifikat
- 2 X Coffe Break + Lunch