Backlog Management : Maximize Potential of Your Maintenance Resources to Increase Productivity
Backlog Management : Maximize Potential of Your Maintenance Resources to Increase Productivity
Harris Hotel – Jakarta | November 1-3 ,2010 | Rp 5.000.000,-
Objective
Upon completion this training, the participant will understand how to do to do preventive maintenance, corrective maintenance and predictive maintenance to achieve high availibilty of production, good perfomance and could optimize maintenance cost.
Besides having the ability mention above, the participant will be more aware to the problems occur during the maintenance since they apply back log management system.
Unit Lesson
Unit One : Mechanical Awareness
Unit two : Scope of Maintenance
Unit three : Backlog Maintenance
Unit four : Practices
- Unit one
MECHANICAL AWARENESS
Content
- Maintenance and Safety
- • General Inspection
- • Hazardous Awareness
- • Safety Procedure
- Power system Inspection
- Power Line Inspection
- Electrical Inspection
- Attachement and support equipment
- Unit Two
SCOPE of MAINTENANCE
Content
- Maintenance Management System
- a. Basic knowledge of Maintenance
- b. The 8 steps of trouble shooting
- Type of Manitenence
- a. Preventive Maintenence
- b. Corective Maintenance
- c. Predictive Maintenance
- Contamination Control
- Unit Three
BACKLOG MANAGEMENT
Content
- Backlog Management
- a. Inspection
- b. Repair Before Failure
- c. Troubleshooting
- d. Repair
- Monitoring
- a. Recording
- b. Control System
- Case Study: Backlog
- Discussion
- a. Maintenance Practice
- b. Daily Inspection
- Unit Four
PRACTICES
Level of Participant
Manager, Supervisor and High Level Mechanic
Date & Venue
November 1-3 ,2010
Harris Hotel – Jakarta
Tuition Fee
- Rp 5.000.000,- (Five Million Rupiah).
- Tuition fee included Instructor Fee, Training kit, 2X Coffee Break, Lunch, Modul and Certificate.
- Excluded any government taxes.