DESKRIPSI
The objective of this course is to present the factors involved in operation of the gas turbine generating unit, including typical procedures for start-up and shut-down of the unit. On-load operation is discussed with particular emphasis on operating hazards and limitation. The course generally focuses on the heavy industrial type gas turbine.
MATERI
- Objectives of operating maneuvers
- Auto/manual operation
- Start-up prerequisites
- Auxiliary systems required for start-up
- Turning gear
- Starting device and torque convertor
- “Break away” and speed adjustment
- Necessity for unit purge
- Ignition and light-off
- Speed control to synchronization
- Start-up curve
- Minimum load setting
- Change over from start-up to operating conditions
- Permissible rate of loading
- Base load and peak load (overload)
- Governor control, speed droop characteristic
- Exhaust temperature control (override)
- Procedure for shutdown
- Need for even cooling
- Spin cooling; turning gear
- Operating hazards; mechanical, thermal, combustion
- Overspeed
- Bearing failures
- Vibration detectors
- Mechanical unbalance
- Turbine blade deposits
- Thermal unbalance, distortion, misalignment
- Conditions required for combustion
- Effects of overfiring
- Loss of ignition, explosion
- Accumulation of unburned carbon
- Need for complete monitoring and control system
- Case Studies
INSTRUKTUR
Teguh Santoso ST, MT
Expert in Gas Turbin & Power Plant
WAKTU & TEMPAT
- 17-19 April 2012 : Hotel Scarlet Dago – Bandung
- 11-13 September 2012 : Hotel Harris Tebet – Jakarta
- 11-13 Desember 2012 : Hotel Ibis – Semarang
METODE
Presentation, Discussion, Case Study, Evaluation, Post-Test & Pre-Test
FASILITAS
Certificate, Training Kit, Module / Handout, Lunch, Coffee Break, Souvenir
PESERTA
Power plant managers, supervisors, and engineers, Suppliers of Turbine – Generator components and services
INVESTASI
- Rp. 6.500.000,- / orang (Non-Residential)
- Rp. 5.500.000,- / orang (Non-Residential), minimum 2-3 peserta