By March 26, 2012 0 Comments Read More →

GAS TURBINE POWER PLANT

GAS TURBINE POWER PLANT

Hotel Scarlet Dago Bandung | 17-19 April 2012  | Rp  8.500.000,-
Hotel Harris Tebet,  Jakarta | 11-13 September 2012 |  Rp 8.500.000,-

Hotel Ibis, Semarang  | 11-13 Desember 2012 | Rp  8.500.000,


DESKRIPSI                                     

The objective of this course is to present the factors involved in operation of the gas turbine generating unit, including typical procedures for start-up and shut-down of the unit. On-load operation is discussed with particular emphasis on operating hazards and limitation. The course generally focuses on the heavy industrial type gas turbine.

MATERI

  • Objectives of operating maneuvers
  • Auto/manual operation
  • Start-up prerequisites
  • Auxiliary systems required for start-up
  • Turning gear
  • Starting device and torque convertor
  • “Break away” and speed adjustment
  • Necessity for unit purge
  • Ignition and light-off
  • Speed control to synchronization
  • Start-up curve
  • Minimum load setting
  • Change over from start-up to operating conditions
  • Permissible rate of loading
  • Base load and peak load (overload)
  • Governor control, speed droop characteristic
  • Exhaust temperature control (override)
  • Procedure for shutdown
  • Need for even cooling
  • Spin cooling; turning gear
  • Operating hazards; mechanical, thermal, combustion
  • Overspeed
  • Bearing failures
  • Vibration detectors
  • Mechanical unbalance
  • Turbine blade deposits
  • Thermal unbalance, distortion, misalignment
  • Conditions required for combustion
  • Effects of overfiring
  • Loss of ignition, explosion
  • Accumulation of unburned carbon
  • Need for complete monitoring and control system
  • Case Studies




INSTRUKTUR

Teguh Santoso ST, MT
Expert in Gas Turbin & Power Plant



WAKTU & TEMPAT

  • 17-19 April 2012                      : Hotel Scarlet Dago – Bandung
  • 11-13 September 2012           : Hotel Harris Tebet – Jakarta
  • 11-13 Desember 2012             : Hotel Ibis – Semarang


METODE
Presentation, Discussion, Case Study, Evaluation, Post-Test & Pre-Test



FASILITAS

Certificate, Training Kit, Module / Handout, Lunch, Coffee Break, Souvenir



PESERTA

Power plant managers, supervisors, and engineers, Suppliers of Turbine – Generator components and services

INVESTASI

  • Rp. 6.500.000,- / orang (Non-Residential)
  • Rp. 5.500.000,- / orang (Non-Residential), minimum 2-3 peserta

 

 

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

About the Author:

Post a Comment