Primary & Remedial Cementing
Primary & Remedial Cementing
The Jayakarta Hotel, Bandung | 03-05 April 2012 | IDR 7.799.000,-/participant
The Jayakarta Hotel, Bandung | 04-05 July 2012 | IDR 7.799.000,-/participant
The Jayakarta Hotel, Bandung | 03-05 October 2012 | IDR 7.799.000,-/participant
Abtract
This course is designed for engineers, technologists, and field supervisors engaged in drilling, completions, and workovers. This session will cover cement standards, cement materials, primary cementing, plug cementing, squeeze cementing, cement evaluation, and good cementing practices. A complete set of course materials and lunches are included. The course covers all aspects of well cementing, from slurry design to primary and remedial cementing
Course Outline :
I. | Cements | |
A. | Manufacturing Processes | |
B. | Chemical Makeup | |
C. | Cement Characteristics | |
D. | API Classification Of Portland Cements | |
E. | Non-API Cements | |
II. | Cementing Equipment | |
A. | Pumps | |
B. | Bulk Equipment | |
C. | Mixing Equipment | |
III. | Cementing Accessories | |
A. | Thread Locking Compounds | |
B. | Guide, Float And Differential Fill Equipment | |
C. | Centralizers | |
D. | Scratchers | |
E. | Turbulence Inducers | |
F. | Stage Tools | |
G. | Packers, Bridge Plugs And Retainers | |
H. | Plugs | |
I. | Heads | |
J. | Baskets | |
IV. | Cement Operations | |
A. | Placement Methods | |
B. | Multi-Plug Usage | |
C. | Multi-Slurry | |
D. | Multi-Stage Operations | |
E. | Tack Cementing | |
F. | Liner Jobs | |
G. | Flow Regime Considerations | |
H. | Casing Movement | |
V. | Additives | |
A. | Accelerators | |
B. | Extenders | |
C. | Retarders | |
D. | Weighting Agents | |
E. | Dispersants | |
F. | Fluid Loss Control Agents | |
G. | Lost Circulation Materials | |
H. | Miscellaneous | |
VI. | Mud Removal | |
A. | Well Preparation | |
B. | Mud Conditioning | |
C. | Removing Immobile Mud | |
D. | Casing Movement As An Aid | |
E. | Interactions Between Mud And Cement | |
VII | Cement Slurry Design | |
A. | Choose A Cement | |
B. | Determination Of Pumping Time Requirement | |
C. | Selection Of Admixes | |
D. | Final Makeup Description | |
E. | Slurry Testing (Using Actual Mix Water) | |
VIII. | Cement Job Design | |
A. | Job Type Selection | |
B. | Job Calculations | |
C. | Equipment Selection | |
D. | Accessory Planning | |
E. | Well Security And Control | |
IX. | Remedial Cementing | |
A. | Squeeze Cementing | |
B. | Recementing | |
X. | Cement Job Evaluation | |
A. | Pressure Testing | |
B. | Logging |
Objective :
- A complete understanding of oilwell cementing.
- The confidence and knowledge necessary to plan and supervise the execution of a cement operation.
- A course manual, completed problem set and thirty-two (24) hours of class notes covering and reinforcing cementing from A to Z.
Who Should Attend
Drilling Engineer, Completion Engineer, Intervention Engineer, Well Site Leader, Drill Site Manager, Well Site Manager, Industry Personnel, Asset Team Member,
Instructors
DR. Ir. Drs. Herianto, MSc
Instructor Public and Inhouse Training at Drilling, Completion and Production Programs Pipe Line ,Economic Evaluation, Refinery, Contract Project Management and Data base Management., PT Bangun Abadi Consultant (BacK) , PT. WISH, PT. Gama Spektra Consultant, PT. Indotrain, PT. Mekarjati Utama, LPPK Kusumawardani, PT. Nindya Pratama, PT. Frimandiri Utama, PT. Radian Utama, PT. Chevron Pasific Indonesia, CNOOC SES, PetroChina International Bermuda. PT. Pertamina EP, Medco Energy, BP, Kodur Petroleum SE, Sclumberger, BP Migas, PN Gas, Pertamina Pengolahan Dumai and Balikpapan.
TEMPAT DAN WAKTU
Waktu : 08.30-16.30 WIB
Tempat : The Jayakarta Hotel, Bandung
Tanggal :
- 03-05 April 2012 (Bacth II)
- 04-05 July – 01 August 2012 (Bacth III)
- 03-05 October 2012 (Batch IV)
INVESTASI
- IDR 7.799.000,-/participant non residensial.
- For send 3 participant discount 10 %.
FASILITAS
- Meeting Room Hotel ****
- Training KIT
- Souvenir
- Sertifikat
- 2 X Coffe Break + Lunch
cforms contact form by delicious:days