By March 20, 2012 0 Comments Read More →

RISK ASSESSMENT AND RISK MANAGEMENT

ADVANCED PROCESS RISK ASSESSMENT AND RISK MANAGEMENT
Hotel Ibis,Yogjakarta | 26-28 Maret 2012 | Rp. 5.500.000 Per Peserta
Hotel Ibis,Yogjakarta | 2-4 April 2012 | Rp. 5.500.000 Per Peserta
Hotel Ibis,Yogjakarta | 9-11 April 2012 | Rp. 5.500.000 Per Peserta
Hotel Ibis,Yogjakarta | 16-18 April 2012 | Rp. 5.500.000 Per Peserta
Hotel Ibis,Yogjakarta | 23-25 April 2012 | Rp. 5.500.000 Per Peserta
Hotel Ibis,Yogjakarta | 30 April-2 Mei 2012 | Rp. 5.500.000 Per Peserta




OBJECTIVES

  • Selection of appropriate risk assessment techniques, including process/work place based versus the task-based approach
  • Monitor and review the effectiveness of an organisation’s risk assessment procedures relevant to process hazards.
  • Plan improvements to your organisation’s risk assessment procedure on a rational basis

OUTLINES

1 – Introduction to Risk Assessment

  • Introduction to HSE Management Systems
  • Integrating risk assessment within Risk Management
  • Semi-quantitative risk assessment techniques – machinery based
  • The task-based approach to risk assessment

2 – Hazard and Operability Studies ‘HAZOP’

  • Introduction to hazards identification and analysis techniques
  • Techniques for hazard identification and analysis – HAZOP
  • Application of HAZOP to relevant processes
  • Planning and implementing within risk management system

3 – Analysis of the consequences

  • Introduction into reliability technology
  • Failure Modes and Effects Analysis ‘FMEA’
  • Analysis of the consequences – mechanics of fire, explosion and toxic releases
  • Role of Fault Tree Analysis to identify how accidents can happen

5 – Quantified Risk Assessment ‘QRA’

  • Introduction to Quantified Risk Assessment ‘QRA’
  • The role of Event Tree Analysis in scenario development
  • The role of Fault Tree Analysis for multi-causation analysis
  • Applications for ETA and FTA

6 – Modern HSE Management Systems

  • Elements, sub-elements and expectations of HSE-MS
  • The role of risk management within HSE-MS
  • The role of HSE Audits
  • Procedures for planning and implementing of action plans

TIME AND VENUE

  •  Hotel Ibis,Yogjakarta
  •  27-29 Februari 2012
  •  12-14 Maret 2012
  • 19-21 Maret 2012
  • 26-28 Maret 2012
  • 2-4 April 2012
  • 9-11 April 2012
  • 16-18 April 2012
  • 23-25 April 2012
  • 30 April – 2 Mei 2012

 

INVEST & FACILITY

  • Rp.5.500.000 (Non Residential)
  • Fasilitas : Certificate,Training kits, USB,Lunch,Coffe Break, Souvenir
  • Untuk peserta luar kota disediakan transportasi antar-jemput dari Bandara/Stasiun ke Hotel (khusus bagi perusahaan yang mengirimkan minimal 3 orang peserta)

INSTRUCTUR

Ir. Paryana Puspaputra, M.Eng., Ir. Tri Prakosa, M.Eng., and Team

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

About the Author:

Post a Comment