Informasi dan jadwal training engineering, IT, Migas, Laboratorium, HSE dan Bersertifikasi Resmi

Butuh Training tentang Engineering?

Silakan ketik kebutuhan training Anda di sini. Ada lebih 4.500 topik dan Puluhan Ribu Event sepanjang tahun 2025

Advanced Cable Accessories

Advanced Cable Accessories 
Yogyakarta | 25-28 June 2012 | IDR 7.000,000.00 per participant
Yogyakarta | 22-25 October 2012 | IDR 7.000,000.00 per participant




DESCRIPTION

Professional “On-site” training on Distribution underground cable accessories from 5KV – 69KV from various manufacturers. The course is designed according to the type of cable and cable accessories utilized by your company

WHO SHOULD ATTEND

This course is recommended for Maintenance Electricians, Electrical Contractors, Safety Inspectors, Supervisors, Engineers

SUMMARY OUTLINE

I. INTRODUCTION

  1. Class Introductions
  2. Course Overview
  3. Documentation Overview
  4. Practical Application
  5. Jobsheet #1 – Perform an undemonstrated 1KV tape splice
  6. Overview of practical application

II. Fundamentals of Low Voltage splicing

1. Overview of low voltage splicing methodologies

1. Resin

2. Tapes

3. Heat shrink

4. Cold Shrink

2. Overview of low voltage Cold Shrink Technologies

1. Cold Shrink Technology definitions

2. Cold Shrink applications

3. Comparative analysis of cold shrink vs. heat shrink

3. Practical Application

1. Jobsheet #2 – Perform a 3/Conductor 1KV teck cable splice

III. Fundamentals of High Voltage Termination

1. High Voltage Functional elements

  • Cable components
  • Electrical characteristics

2. High Voltage Termination Techniques

1. Termination Classifications

  • lass 1 Terminations
  • Class 2 Terminations
  •  Class 3 Terminations

2. Cable Preparation

3. nstructors demonstration of a Class 1 Termination procedures

3. Practical application

1. Jobsheet #3 – Perform a Class 1 Termination

IV. Fundamentals of High voltage Splicing

1. High Voltage Tape splicing Techniques

  • Cable components
  • Electrical characteristics
  •  Instructors demonstration of cable preparation

2. Practical application

  •   Jobsheet #4 – Perform a 15KV mono conductor cable tape splice

3. High voltage Premolded splicing Techniques

  •   Comparative analysis of tape splice vs. premolded splicing
  •    Cable Components
  •   Overview of cable splicing

4. Practical Application

  • Jobsheet #5 – Perform a 15KV mono conductor premolded splice

Teguh Santoso, Ir
Teguh Santoso experienced more than 26 years in Electrical.

COURSE METHODE

  • Presentation
  • Discuss
  • Case Study
  • Evaluation
  • Simulation

TIME & VENUE

  • Yogyakarta
  • 13-16 February 2012
  • 25-28 June 2012
  • 22-25 October 2012
  • 4 days – 08 am – 04 pm

COURSE FEE

IDR 7.000,000.00 per participant non residential

FACILITY

  • Module / Handout
  • Certificate
  • Souvenir
  • Training Kit

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.