INTRODUCTION
Gas turbine in oil and gas used for gas plant and power plant facilities, both of plant are critical plant to append activity of production and delivery system of oil and gas. Reliability and deliverability is more important factor to provide effectiveness system after all.
OBJECTIVE
After the course participant :
- Have a good knowledge of gas turbine out and technology include thermodynamic concepts, construction, detail component’s and function
- Will improve their ability to understand cause and effect of failure to guide root cause analysis in problem solving and trouble shooting
Familiar with product of gas turbine which is used in the gas plant
GAS TURBINE OPERATION & MAINTENANCE TRAINING OUTLINE
- Introduction to Gas turbine
- An Overview of Gas Turbines
- History of gas turbine
- Gas turbine in oil and gas industry
- Brayton cycle
- Gas turbine art and design
- Engine design
- Operation principle
- Engine case and inlet air
- Gas turbine in detail assembly and function of components
- Compressor section : Inlet guide vane, Rotor compressor,Stator Compressor,Bleed Valve and control.
- Diffuser and Combustor : Combustion chamber, Fuel Nozzle,Ignition plug
- Turbine and exhaust : Inlet nozzle, Blade turbine and cooling system
- Auxiliary Components and Accessories : Bearings and Seals, Gears
- Gas turbine bearing and lubrication system
- Ingition system
- Bearing and seals
- Fuel gas and gas system
- Basic combustion in gas turbine
- Heating value in natural gas (LHV and HHV), Wobb number
- Stochiometric combustion
- Emission of combustion
- How gas burned in combustion chamber
- Cooling technology and thermal barrier coating
- Compressor in gas turbine
- Energy convertion in compressor
- How compressor work (increase pressure and flowing gas)
- Gas flow compressor phenomena stall and surge,
- How to control control surge ( IGV and bleed valve)
- Compressor failure and material
- Turbine who it works
- Convert Pressure and temperature to Mechanical energy
- How blade turbine work
- Internal cooling and coating
- Failure in turbine component
- Gas turbine operation and control
- Operation gas turbine for gas compressor
- Operation gas turbine for Power Generation
- Fuel control system
- IGV control system
- Lubrication control system
INSTRUCTOR
Ir. Deddy Nugraha is a dedicated experienced fulltime trainer and technical consultant since 2002. He holds a B.S. degree in Mechanical Engineering from ITB, Bandung. He has worked nationally in a wide variety of industries including: technology, aerospace, utilities, auditing, mining and institutions thus engaged as a corporate consultant. He also holds certifications for those particular fields from Snecma, France; Engine Support Inc., USA; Danobat, Spain; DNV, Singapore; MTU, Germany and FAA Auditor, USA. Mr. Nugraha is a member of Indonesian Society for Reliability and was elected as General Sectretay for 2004-2007 period. He has trained hundreds of managers, engineers and floor associates, subjects taught to include; CMMS, RCM, TPM, Project Management, Quality Process Control, Corrosion Control and Protection, Failure Analysis, Engineering Design, Instalation & Constrcution, Inventory Control and Management. Major clients include: Pertamina, British Petroleum, Petrochina, Siemen Power, PT. Indonesia Power, PT. Krakatau Steel, Freeport Indonesia, PT. Surveyor Indonesia, Chevron, Medco Energy, PT. Aneka Tambang, Garuda Maintenance Facility, PT. Perusahaan Gas Negara, PT. Semen Padang, PT. Semen Gresik, PT. Indah Kiat Pulp & Paper, PT. Tjiwi Kimia, PT. Pupuk Kujang and PT. Kaltim Prima Coal.
VENUE
Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll
TRAINING DURATION
4 days
- 27 Apr 2020-30 Apr 2020
- 05 Mei 2020-08 Mei 2020
- 02 Jun 2020-05 Jun 2020
- 27 Jul 2020-30 Jul 2020
- 04 Agust 2020-07 Agust 2020
- 29 Sep 2020-02 Okt 2020
- 06 Okt 2020-09 Okt 2020
- 03 Nop 2020-06 Nop 2020
- 28 Des 2020-31 Des 2020
INVESTATION PRICE/ PERSON
- Rp 8.500.000/person (full fare) or
- Rp 8.250.000/person (early bird, payment 1 week before training) or
- Rp 7.950.000/person (if there are 3 or more participants from the same company)
FACILITIES FOR PARTICIPANTS
- Training Module
- Flash Disk contains training material
- Certificate
- Stationeries: NoteBook and Ballpoint
- T-Shirt
- Bag
- Training Photo
- Training room with Full AC facilities and multimedia
- Lunch and twice coffeebreak every day of training
- Qualified Instructor
- Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)
RECOMMENDATION FOR PARTICIPANTS
For practice session: every participant is recommended to bring laptop/notebook for software installation and practice
GAS TURBINE OPERATION & MAINTENANCE