By April 4, 2012 0 Comments Read More →

INTEGRATED PIPELINE DESIGN, OPERATION DAN MAINTENANCE

INTEGRATED PIPELINE DESIGN, OPERATION DAN MAINTENANCE – Yogyakarta

Hotel All Seasons, Yogyakarta |  24-26  April 2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta | 29-31 Mei  2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta | 19-21  Juni 2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta |   11-13  Juli  2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta | 8-10 Agustus  2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta | 18-20 September  2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta | 2-4 Oktober 2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta | 6-8  November  2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta |  27-29 November 2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta | 5-7 Desember   2012 | IDR  5.500.000 per participant 
Hotel All Seasons, Yogyakarta | 27-29 Desember 2012 | IDR  5.500.000 per participant



DESKRIPSI

Pipeline atau perpipaan merupakan salah satu peralatan utama di dalam industri baik industri petrokimia, perminyakan, pertambangan dan lain-lain yang digunakan sebagai salah satu alat transportasi zat cair. Komponen utama perpipaan adalah  pomp dan jaringan pipa, sementara komponen-komponen bantu adalah katub-katub dan strainer (block valve, control valve, strainer, foot valve, dll), fiting (elbow, tee, reducer, inducer, dll) dan berbagai alat bantu lain yang diperlukan. Selain komponen utama dan bantu, perpipaan masih dilengkapi dengan beberapa instrumen misalnya instrumen alat ukur.

Unjuk kerja perpipaan mempunyai pengaruh yang sangat signifikan terhadap unjuk kerja proses. Unjuk kerja perpipaan sangat dipengaruhi oleh proses perencanaan (design), cara mengoperasikan (operation) dan perawatan (maintenance). Kursus ini membahas bagaimana cara mendesain, cara pengoperasian dan perawatan perpipaan.



MATERI

  1. Pendahuluan : transportasi fluida cair di dalam pipa, aturan dan standard.
  2. Instrumen pada perpipaan : alat ukur tekanan, flow meter, thermometer
  3. Valve : Gate valve, butterfly valve, check valve, control valve
  4. Pipe Fitting
  5. Engineering Flow Diagram, Lay out, Isometric Drawing dan detail.
  6. Konstruksi dan karakteristik Pompa sentrifugal.
  7. Karakteristik aliran fluida cair.
  8. Titik kerja, NPSHa dan NPSHr pompa sentrifugal, Brake Horse Power
  9. Control Valve; konstruksi dan karakteristik control valve, control valve sizing
  10. Prosedur start and stop pompa sentrifugal.
  11. Trouble shooting pompa sentrifugal dan jaringan perpipaan.
  12. Corrosion control di jaringan perpipaan.
  13. Panel control (wiring diagram) pompa centrifugal; direct on line (DOL), star-delta starter.

 

PESERTA

Piping engineers, mechanical engineers, maintenance engineers & supervisors, Service engineers & supervisors, technicians and inspectors responsible for the design, work over engineers & supervisors, plant Engineers and Petroleum Engineers.

METODE

Lecturing,  studi kasus, simulasi, praktek, presentasi dan evaluasi



INSTRUKTUR
Ir. Y Agus Jayatun, MT and team




TEMPAT

  • Hotel All Seasons, Yogyakarta



INVESTASI

  • IDR  5.500.000 per participant – non residential



FASILITAS

  •  Training module (hard & cd softcopy)
  • Training kit (tas seminar atau backpack)
  • 2x coffee break, 1x lunch
  • Souvenir
  •  Sertifikat
  • Training Photo
  • Picking-up service dari Bandara/Stasiun KA ke hotel (min. 2 orang peserta dari perusahaan yang sama)


Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

About the Author:

Post a Comment