Informasi dan jadwal training engineering, IT, Migas, Laboratorium, HSE dan Bersertifikasi Resmi

Butuh Training tentang Engineering?

Silakan ketik kebutuhan training Anda di sini. Ada lebih 4.500 topik dan Puluhan Ribu Event sepanjang tahun 2025

Manufacturing Planning and control

Manufacturing Planning and control

Menara Peninsula, Jakarta | 25 – 26 Februari 2013 |  Rp. 3.500.000-




Sasaran

  • Pemahaman dasar mengenai manufacturing management
  • Metode, teknik & terminology yang digunakan dalam manufacturing management
  • Memahami bagaimana manufacturing management mempengaruhi sasaran organisasi
  • Bagaimana manufacturing management mendukung eksekusi strategi bisnis

Materi

  • Dasar2 operation management: kenapa perlu & penting untuk memahami operation management,  operation management & supply chain, operation management dan daya saing
  • Introduction to manufacturing management: beberapa manufacturing strategy: make to stock, make to order, assemble to order, lead time, varian produk & volume, beberapa pilihan layout manufacturing, batch flow vs flow production, pull & push model
  • Manufacturing product structure: bill of material, format BOM, akurasi BOM, work center, utilisasi & efisiensi, proses routing, product costing component
  • Dasar2 MRP (material requirement planning): independent vs dependent demand, , sasaran MRP, MRP input & output, mekanisme menghitung MRP
  • Bagaimana mengelola MRP: explosion, peran material planner, action message, mengukur performance MRP
  • Perencanaan kapasitas dan bagaimana mengelolanya: elemen kapasitas, sasaran capacity planning, menghitung work center capacity, work center load, finite & infinite loading, load profile, mengelola shortage capacity
  • Production activity control – PAC (bagaimana mengelola aktivitas produksi di shop floor) : sasaran PAC, PAC database file,  proses order release ke work center, penjadwalan produksi, backward scheduling, dispatching rule, data collection & monitoring
  • Advance scheduling: MRP push scheduling, MRP vs lean scheduling, order dispatching, langkah rescheduling, work center load profile, operation overlapping, lot splitting, input/output reporting
  •   Lean production management: definisi lean, definis just in time (JIT), mengurangi waste, stadarisasi & 5S, kanban, heijunka scheduling, takt time scheduling

Fasilitator :

Iwan Nova

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.