PRODUCTION LOGGING

PRODUCTION LOGGING

Bandung | 25 – 28 August 2014 | Rp 8.500.000/person
Bandung | 16 – 19 September 2014 | Rp 8.500.000/person
Bandung | 20 – 23 October 2014 | Rp 8.500.000/person
Bandung | 18 – 21 November 2014 | Rp 8.500.000/person
Bandung | 15 – 18 December 2014 | Rp 8.500.000/person

 

TRAINING DESCRIPTION:

The training covers the practical and theoretical aspects modern production logging operations in terms of tool selection and data requirements, measurement limitations, analysis and its pitfalls. In the practical sessions, real field data are analyzed and the results discussed in depth.

 

OBJECTIVE:

This training is designed for engineers and other technical personnel who are involved at any stage in the specification, acquisition or interpretation of cased-hole wireline measurements. The training aims to provide a practical understanding of the physical phenomena involved, measurement principles, equipment types and the analysis of production logging surveys.

TRAINING MATERIAL OUTLINE PRODUCTION LOGGING
1. Introduction

  •  Overview of layered reservoir behavior in producers/injectors as measured by wireline tools

2. Flow Rate Measurement

  • Measurement of flow rate by spinner, spinner flow meter calibration
  • Case Study: Spinner calibration and interpretation in an inclined well, shut in and flowing, layered inflow performance

3. Fluid Identification

  •  Phase hold up by pressure gradient, radio active fluid density and dielectric (capacitance) based methods

4. Temperature Measurement

  • Main features of temperature profiles in producing and injecting wells
  • Anomalous temperature profiles

5. Pressure Measurement
6. Calliper, Gamma Ray, CCL, and Depth Control: Modern Production Logging Toolstrings
7. Two Phase Flow

  • PVT properties, flow regimes, simplistic slip velocity model
  • Case study cont; two-phase interpretation, shut in and flowing, complicating factors, well deviation misleading responses

8. Three phase flow

  •  Horizontal wells: problems encountered with conventional logging sensors
  •  Recent developments: probe tools, hold-up imaging, phase velocity measurement

9. Miscellaneous Sensors

  • Fiber optics, down-hole video, noise logging

 

 

INSTRUCTOR :

Ir. Sudiharto, MT. and team

Ir. Sudiharto, MT,  is alumnus from Bandung Institute of Technology (ITB) department of petroleum engineering. Ir. Sudiharto besides as instructor and researcher at Geothermal Laboratory ITB, he is also being as Production Engineer at LAPI ITB, Production & Reservoir Analist and  expert board (Dewan Pakar) at Forum Komunikasi Daerah Penghasil Migas, and joining in Community Development Team Dirjen Migas since 2003.

Some projects have been handled by him such as policy analysis expert on oil and gas subsector, oil and gas production expert, and field economicity such as: projection study investation potency energy and mineral resources, implementation study national energy consumtion, study on field use of Brownfield in Indonesia, inventarization research of old well potential in regency of Muaro Jambi,  blueprint arrangement manpower on oil and gas subsector, development operation cost estimation system oil and gas: geological and geophysical stage, study of combustion flare gas at PERTAMINA DOH Jawa Bagian Barat, survey and development of GIS based datas for planning and distribution BBM  and transportation gas through pipe, study on planning of Indonesia – Asean pipeline system, etc. Ir. Sudiharto have trained for training class for many companies in Indonesia. Some topics that have been frequently delivered by him as follows :

  1. Electric Submercible Pump, Problem and Trouble Shooting Mecanism
  2. Crude Oil Analysis
  3. Drilling, Production and Workover Strategy
  4. Well Workover and Completion Stretegy
  5. Petroleum Finance, Acconting and Reservoir Management
  6. Plan of Development in Oil and Gas Industries
  7. Pressure Control for Drilling Engineer
  8. Plan of Development (POD) & Authorization For Expenditures (AFE)
  9. Management Skills Secretary Petroleum Gas and Oil Industries
  10. Pressure Transient Analysis and Well Testing Data Interpretation
  11. Oil Production System and Operation
  12. Formation Damaged and Well Stimulation
  13. Simulasi Reservoir for Petroleum Engineer
  14. Oil and gas transportation/measurement, etc

 

 

VENUE :

Bandung (Golden Flower, Banana Inn, Grand Seriti, Carrcadin, Amaroossa, Grand Serela, Gino Feruci, Verona Palace, Malaka, Zodiac Taurus)

 

TRAINING DURATION :

4 days

 

TRAINING TIME 2014

  1. 14 – 17 April 2014
  2. 19 – 22 May 2014
  3. 17 – 20 June 2014
  4. 8 – 11 July 2014
  5. 25 – 28 August 2014
  6. 16 – 19 September 2014
  7. 20 – 23 October 2014
  8. 18 – 21 November 2014
  9. 15 – 18 December 2014

 

INVESTATION PRICE/PERSON 2014

  1.  Rp 8.500.000/person (full fare)  or
  2.  Rp 8.250.000/person (early bird, payment 1 week before training)  or
  3. Rp 7.950.000/person (if there are 3 or more participants from the same company)

 

FACILITIES FOR PARTICIPANTS:

  1. Training Module
  2. Flash Disk contains training material
  3. Certificate
  4. Stationeries: NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Photo
  8. Training room with Full AC facilities and multimedia
  9. Lunch and twice coffeebreak every day of training
  10.  Qualified Instructor
  11.  Transportation for participants from hotel of participants to/from hotel of training – VV (if minimal participants is 4 persons from the same company)

 

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

About the Author:

Post a Comment