WELL COMPLETION AND WORKOVER
WELL COMPLETION AND WORKOVER – Yogyakarta
Hotel Novotel, Yogyakarta | 01 – 03 Juli 2014 | IDR 7.000.000
Hotel Novotel, Yogyakarta | 14 – 16 Juli 2014 | IDR 7.000.000
Hotel Novotel, Yogyakarta | 23 – 25 Juli 2014 | IDR 7.000.000
Hotel Novotel, Yogyakarta | 05 – 07 Agustus 2014 | IDR 7.000.000
Jadwal Training 2013 Selanjutnya…
OBJECTIVES
- Memahami prinsip-prinsip dasar penyelesaian sumur produksi minyak dan gas bumi (oil and gas well completion) .
- Melakukan diagnosis sederhana dalam menangani problema pada sumur produksi di lapangan yang disebabkan oleh reservoir atau fasilitas produksinya.
- Melakukan perhitungan-perhitungan kuantitatif sederhana untuk sumur-sumur minyak yang diproduksikan dengan cara gas lift, ESP, Hydraulic/Jet Pump, Sucker Rod Pump dan PCP.
- Melakukan perhitungan-perhitungan kuantitatif sederhana untuk perancangan dan perancangan ulang penangan problema kepasiran di sumur produksi.
TRAINING OUTLINES
1. Pendahuluan
2. Penyelesaian sumur (Well Completion)
- Tipe-tipe penyelesaian sumur
- Tipe penyelesaian sumur berdasarkan pemasangan pipa selubung
- Tipe penyelesaian sumur berdasarkan jumlah zona produksi
- Peralatan bawah tanah
- Pendahuluan
- Peralatan produksi bawah sumur
- Penyelesaian sumur untuk sumur-sumur pengangkatan buatan
- Sucker Rod Pump (Pompa angguk)
- Electric Submersible Pump
- as lift
- ydraulic Pump
- Pompa Jet
3. Kerja ulang sumur (Work Over)
- Faktor-faktor penyebab kehilangan produksi
- Problem Reservoir
- Problem mekanikal
- Perawatan sumur
- Kerusakan Peralatan
- Masalah Parafin
- Pengendapan Scale dan Pengontrolannya
- Masalah Pasir
- Kerusakan Formasi
- Tipe-tipe Pengerjaan Kerja Ulang Sumur
- Mengubah Zona Produksi
- Perangsangan Sumur (Well Stimulation)
- Squeeze Cementing
- Peralatan Kerja Ulang
- Menara (Rig) Konvensional
- Unit Wireline
- Gulungan Tubing Tanpa Sambungan (Endless Tubing Coil)
- Unit Snubbing
4. Sand Control Technology
- Sand Control Concept
- Reason for Sand Control
- Determining Need for Sand Control
- Selecting Type of Control
- Proper Drilling and Completion
- Gravel and Screen Selection
- Slot and Gravel Size Design
- Slotted Liners
- Screens
- Prerpacks
- Inside Gravel Packing
- Perforation Packing
- Two Stages Methods
- Use of Viscous Carrying Fluid
- Downhole Equipment
- Type of Operation
- Sigle Stage Methods
- Open Hole Gravel Packing
- Conventional Methods
- Special Tools and Operations
- Zone Isolation Methods
- Model Study Result
- Deviated Well Problem and Solutions
- Consolidation
- Formation Consolidation
- Consolidation System Features
- Well Preparation and Design Factor
- Consolidated Packs
- Water Base Systems
- Thermosetting Gravel Packs
- Stable Arc Sand Control
- The Stable Concept
- Applying Stress for Sand Control
- Conventional Cementing Limitations
- Downhole Equipment
- Type of Operation
INSTRUCTOR
Sulaiman Tampubolon, ST., MT and team
WHO SHOULD ATTEND?
Operator/ Sr. Operator/ Jr. Engineer/Non Engineer dan siapa saja yang perlu memahami well completion and work over.
METHOD
Lecturing, workshop, interactive discussion, sharing and case study.
TIME & VENUE
- 7-9 Januari / 21-13 Januari /28-30 Januari / 4-6 Februari / 11-13 Februari / 25-27 Februari / 4-6 Maret / 12-13 Maret / 25-27 Maret / 2-4 April / 9-11 April / 22-24 April / 5-7 Mei / 20-22 Mei / 26-28 Mei / 4-6 Juni / 10-12 Juni / 17-19 Juni / 1-3 Juli / 14-16 Juli / 23-25 Juli / 5-7 Agustus / 12-14 Agustus / 19-21 Agustus / 3-5 September / 16-18 September / 22-24 September / 1-3 Oktober / 15-17 Oktober / 21-23 Oktober / 3-5 November / 11-13 November / 19-21 November / 25-27 November / 2-4 Desember / 9-11 Desember / 17-19 Desember / 22-24 Desember 2014
- Hotel Novotel – Yogyakarta
TRAINING FEE
- IDR 7.000.000 per participant (Non-Residential)
- Minimal participants : 2 persons (Yogyakarta)
TRAINING FACILITIES
- Quality Training Module
- Stationeries: notebook and ballpoint
- Flashdisk containing materials
- Training bag or backpack
- Morning and afternoon coffee break for at days of training
- Exclusive T-Shirt or Jacket
- Certificate of Completion
- Training photo
- Transportation for participants from the airport/railway station to hotel/training venue. (At least 2 persons from the same company)
cforms contact form by delicious:days