By June 16, 2016 0 Comments Read More →

Total Productive Maintenance (TPM)

Total Productive Maintenance (TPM)

Jakarta | 26 – 27 Juli 2016 | 08.00 – 16.00 | Rp 4.000.000
Jakarta | 09 – 10 Agustus 2016 | 08.00 – 16.00 | Rp 4.000.000
Jakarta | 13 – 14 September 2016 | 08.00 – 16.00 | Rp 4.000.000
Jakarta | 11 – 12 Oktober 2016 | 08.00 – 16.00 | Rp 4.000.000

Jadwal Training 2016 Selanjutnya …

 

 

Objectives

TPM is a process to maximize the productivity of your equipment for its entire life and will extend the life of the equipment. TPM fosters an environment where improvement efforts in Safety, Quality, Delivery, Cost and Creativity are encouraged, through the participation of all employees. The goal of TPM is to maximize your Overall Equipment Effectiveness (OEE) and to reduce equipment downtime while improving quality and capacity.

This workshop is designed to show that Total Productive Maintenance goes far beyond traditional maintenance boundaries to attack equipment-related waste, including: downtime, speed losses, defects, frequent adjustments, changeover, and breakdowns. Participants are provided with the twelve steps in preparatory and implementation stage of TPM.



Other Benefits:

By attending this workshop, participants also obtain the following benefits:

  • Understand TPM and its major components, including how to measure and increase overall equipment effectiveness and how TPM can help avoid interruptions to production
  • Explain how the TPM process is integrated with other Lean tools to increase productivity
  • Gather and analyze Overall Equipment Effectiveness data to determine equipment constraints
  • Identify the six major equipment-related losses and how to minimize them in order to increase OEE
  • Learn how implementation of the TPM process fosters improvement efforts in safety, quality, delivery, cost, and creativity by all employees

 

Agenda Total Productive Maintenance (TPM)

  1. Introduction / Background
    • Workshop objectives
    • Manager roles and functions.
  2. What is Total Productive Maintenance (TPM)
  3. The Benefits of TPM (Tangible and Intangible Benefits)
  4. The Twelve Six Steps in TPM Preparation
  5. The Six Step TPM Implementation Stage
  6. The Seven Levels of Autonomous Maintenance
  7. Measuring Overall Equipment Effectiveness
    • Availability
    • Performance Efficiency
    • Quality Rate
    • OEE Calculation for a Single Machine
    • Calculating a Line or Process OEE Number
    • Accounting for Quality Losses
    • Plant OEE Calculation
    • Corporate or Division OEE Measures
    • Showing the Results of OEE
    • The Power of OEE.
  8. Closing (Summary and Conclusion).

 

Who Should Attend

Personnel/supervisor/manager from production, maintenance, engineering and quality department.

 

 

Date 

  • 17 – 18 Mei 2016
  • 26 – 27 Juli 2016
  • 09 – 10 Agustus 2016
  • 13 – 14 September 2016
  • 11 – 12 Oktober 2016
  • 14 – 15 November 2016
  • 13 – 14 Desember 2016

Time       : 08.00 – 16.00
Venue    : Hotel Harris Tebet
Jl. Dr. Saharjo No. 191,
South Jakarta (Tentative)

 

Tuition Fee

  • Rp 4.000.000,-
  • The tuition fee of total productive maintenance training included training kits, hand out, 2X Coffee break, lunch and certificate.
  • The fee excluded any government taxes.

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. (required)
  4. PERSONAL DATA
  5. (required)
  6. (required)
  7. (required)
  8. (valid email required)
  9. (required)
  10. (required)
  11. PRE REGISTRATION DATA (Tidak Mengikat)
  12. (required)
  13. MESSAGE FOR TRAINING PROVIDER
 

cforms contact form by delicious:days

About the Author:

Post a Comment