GAS TURBINE POWER PLANT
GAS TURBINE POWER PLANT
Bali / Batam | March 26th -30th 2012 | 08:00-16:00 WIB | Rp 10.000,000,-/peserta
Deskripsi
The objective of this course is to present the factors involved in operation of the gas turbine generating unit, including typical procedures for start-up and shut-down of the unit. On-load operation is discussed with particular emphasis on operating hazards and limitation. The course generally focuses on the heavy industrial type gas turbine.
Course Outline
- Objectives of operating maneuvers
- Auto/manual operation
- Start-up prerequisites
- Auxiliary systems required for start-up
- Turning gear
- Starting device and torque convertor
- “Break away” and speed adjustment
- Necessity for unit purge
- Ignition and light-off
- Speed control to synchronization
- Start-up curve
- Minimum load setting
- Change over from start-up to operating conditions
- Permissible rate of loading
- Base load and peak load (overload)
- Governor control, speed droop characteristic
- Exhaust temperature control (override)
- Procedure for shutdown
- Need for even cooling
- Spin cooling; turning gear
- Operating hazards; mechanical, thermal, combustion
- Overspeed
- Bearing failures
- Vibration detectors
- Mechanical unbalance
- Turbine blade deposits
- Thermal unbalance, distortion, misalignment
- Conditions required for combustion
- Effects of overfiring
- Loss of ignition, explosion
- Accumulation of unburned carbon
- Need for complete monitoring and control system
- Case Studies
What Should Attends
Power plant managers, supervisors, and engineers, Suppliers of Turbine – Generator components and services
Instruktur :
Teguh Santoso ST, MT
Expert in Gas Turbin & Power Plant
Course Method
- Presentasi
- Diskusi
- Studi Kasus
- Evaluasi
- Simulasi
Venue
- Rock Cafe Hotel BALI or HARRIS HOTEL BATAM CENTER
- March 26th -30th 2012
- 08:00-16:00 WIB
Public Training
Course Fee: Rp 10,000,000,-/ participant Nett Non Residential (Min 3)
Fascilities
- Module / Handout
- Sertifikat
- Souvenir
- Training Kit