PREDICTIVE AND PREVENTIVE MAINTENANCE
PREDICTIVE AND PREVENTIVE MAINTENANCE
Hotel Grand Zuri , Yogyakarta | 29 – 31 Juli 2014 | IDR 6.000.000
Hotel Grand Zuri , Yogyakarta | 05 – 07 Agustus 2014 | IDR 6.000.000
Hotel Grand Zuri , Yogyakarta | 13 – 15 Agustus 2014 | IDR 6.000.000
Hotel Grand Zuri , Yogyakarta | 27 – 29 Agustus 2014 | IDR 6.000.000
Hotel Grand Zuri , Yogyakarta | 03 – 05 September 2014 | IDR 6.000.000
Jadwal Training 2014 Selanjutnya …
OUTLINE
- WHY PREVENTIVE & PREDICTIVE MAINTENANCE
- Apprising maintenance performance and effectiveness
- Typical maintenance controls
- Reactive maintenance
- Anticipative maintenance
- Ascertainment of equipment condition
- The need for preventive maintenance
- Why preventive maintenance
- Preventive Predictive maintenance objectives
- Preventive Predictive maintenance prerequisites
- Preventive maintenance feasibility analysis:
- Policies
- PM program functions
- Cost impact
- Saving potential
- DEVELOPING THE preventive PREDICTIVE MAINTENANCE PROGRAM
- Assignment of organizational responsibilities typical maintenance functional assignments operational concepts
- Equipment to be included
- Equipment inventory sheet’ examples
- Equipment numbering concepts
- The PM work order:
- Developing the inspection sheet
- ECS rating sheet as cross reference
- Sample of equipment components
- Spare parts and material needs
- Inspection sheet examples
- Determining the frequency cycle:
- Frequency cycle examples
- Scheduled frequency overview
- Developing job safety practices ? typical examples
- Considering manual versus computerization
- Predictive maintenance can determine maintenance requirement
- Predictive maintenance and its applied techniques as part of the PM program:
- Vibration analysis
- Wear particle analyzing
- Thermography
- IMPLEMENTATION OF PREVENTIVE MAINTENANCE PROGRAM
- Job planning
- The planning function
- Planning, Service to do
- Job planning prerequisite
- Planners qualifications
- Duties and responsibilities of planners
- The hob package
- Line supervisors qualifications
- Planning permits Us, to forecast, communicate and measure
- What job should be planned
- Time required to perform work labor content
- Standard defined
- Consistency of estimating
- Estimating methods
- Work backlog
- Scheduling of maintenance work:
- PERT and CPM as scheduling tools
- Loading of the PM work order
- Load leveling
- Weekly scheduling
- • Manpower requirements forecasting
- Forecasting by crew
- Forecasting by department
- Weekly schedule – Computer and manual example
- Training of personnel
- CONTROLLING THE PREVENTIVE PREDICTIVE MAINTENANCE PROCESS
- Preventive maintenance administration
- Planned maintenance
- Special tools and equipment
- Service user coordination
- Equipment availability
- Service user notification ? examples
- Automotive notification – examples
- 3. Control reporting
- What should be included
- Schedule for supervisor
- Schedule for supervisor service user
- Overdue for maintenance and service user
- Missed PM report for maintenance and service user
- Complete PMs
- Summary report of all PMs completed
- Listing of all PMs set-up in program
- Planning and scheduling index example
- Assurance of work performed
- Conformance and auditing
- Feedback evaluation/corrective action cycle
- Preventive maintenance administration
INSTRUCTOR
Ir. Rini Dharmastiti, M.Sc. Ph. D.
DELIVERY TYPE
Lecturing, interactive discussion, and case study.
WAKTU & TEMPAT
- 29-31 Juli / 5-7 Agustus / 13-15 Agustus / 27-29 Agustus /3-5 September / 17-19 September / 23-25 September / 1-3 Oktober / 14-16 Oktober / 29-31 Oktober / 4-6 November /12-14 November / 25-27 November / 2-4 Desember / 9-11 Desember / 16-18 Desember / 22-24 Desember / 29-31 Desember 2014
- Hotel Grand Zuri – Yogyakarta
TRAINING FEE
- IDR 6.000.000 per participant (Non-Residential)
- Minimal participants : 2 persons
FACILITIES
- Quality Training module
- Stationeries: notebook and ballpoint
- Training bag or backpack
- Morning and afternoon coffee break for a long of the training
- Exclusive T-Shirt
- Certificate of Completion
- Training photo
- Transportation for participants from the airport/railway station to hotel/training venue (Minimal number of participants from the same company is 2 persons)